

Project Description
Biological Etp-FGR tank modification including Scafolding, erection, dismantling, surface cleaning, anti-corrossive paint inside and outside full tank, crane and all other safety equipment.
.
Key of Operations
- Scaffolding
- Media Cleaning
- ETP tank dismantle
- ETP tank (Fabrication & Erection)
- Heavy equipment lifting
- House keeping (Proper)